An NA Order — short for Non-Agricultural Order — is the official declaration from the Sub-Divisional Magistrate (SDM) or Assistant Collector confirming that agricultural land has been legally converted for residential, commercial, or industrial use. It matters because land still classified as agricultural cannot legally have a house or shop in Uttar Pradesh, no matter what's physically built on it — registration gets harder, loans get refused, and building plan approval is denied outright. This guide covers the process, what to check on the order itself, and what recently changed. Whether you're buying land in Uttar Pradesh for a house, evaluating agricultural land for sale in uttar pradesh to build on, or preparing to sell converted land, this is the document that confirms the land's legal status.
Section 1 — What is an NA Order in Uttar Pradesh?
Before working through the conversion process, it helps to view the surrounding parcels on a map — you can check the 2Bigha map for Uttar Pradesh while you confirm a specific plot's location and boundaries.
Definition: An NA Order is the SDM's formal declaration that agricultural land has been legally converted to non-agricultural use, making it eligible for residential, commercial, or industrial development.
It's the foundational document in the chain — before building plan approval can even be considered, the land itself has to be cleared for non-agricultural use. This is different from a mutation (Dakhil Kharij), which only updates who owns the land, and different from a building plan approval, which sanctions the specific structure. An NA Order answers a narrower but essential question: is this land, as classified in government records, even legally allowed to carry a house or shop? Buyers often skip checking this because a plot "looks" residential — with a boundary wall and a road — when its underlying revenue classification is still agricultural.
State-specific note: In UP, the conversion process was traditionally done under Section 143 of the UP Zamindari Abolition & Land Reforms Act, 1950; it's now Section 80 of the UP Revenue Code 2006, but many people, agents, and even old documents still refer to it as "Section 143 conversion."
Expert Tip: Ask specifically whether the NA Order covers the entire khasra number or only a portion of it — partial conversions are common when a larger agricultural holding is being sold off in smaller residential plots, and buying a plot that falls outside the converted portion is a mistake that's easy to miss on a quick document check.
Section 2 — How to Get an NA Order in Uttar Pradesh?
Applications are filed with the SDM, with increasing digital integration for tracking and documentation. Compare the available routes:
Method | Cost | Time | Legally valid for registration? |
Online (application submitted digitally, pending) | Scrutiny fee paid at filing | Pending SDM review and Lekhpal report | No — only the signed order counts |
Online (digitally issued/signed order) | Same fee, no separate charge | Available once approved | Yes |
Offline (SDM/Tehsil office) | Same fee structure, paid at the office | Often several months in manual-process districts | Yes, once collected with signature/seal |
Check the current digital channel with your Tehsil: UP has been integrating conversion applications with Bhulekh and mutation systems; confirm the exact portal your district uses.
Submit the application with land details: Enter the khasra number, area, and the proposed non-agricultural use.
Upload supporting documents: Attach ownership proof and any required site details.
Pay the scrutiny fee: Complete payment as instructed by the portal.
Track status until the order is issued: Use your application reference to monitor Lekhpal verification and SDM approval.
Visit the SDM/Tehsil office covering the land's location.
Submit the application with the khasra number and ownership documents.
Await Lekhpal field verification: A revenue official checks the site and reports back to the SDM.
Collect the signed NA Order once approved.
This process has historically taken longer in UP compared to states with fully automated systems — often several months, where manual verification is still the norm. Before treating the order as final, check that the khasra number, area, and approved use exactly match what you intend to build or what's already listed for sale.
Section 3 — What Does an NA Order Contain?
The same verification applies whether you're checking an NA Order here or comparing it to a similar document elsewhere, like a CLU certificate in another state — every conversion order should tie back cleanly to a specific khasra number.
Field | What it means | What to check |
Issuing authority | The SDM or Assistant Collector who approved it | Confirm it matches the land's actual jurisdiction |
Khasra/survey number | The specific plot (or portion) covered | Cross-check against the khatauni and sale deed |
Approved use | Residential, commercial, or industrial | Should match your intended purpose exactly |
Area converted | The exact area covered by the order | Confirm it covers the whole plot, not just a portion |
Order number and date | Reference for the approval | Verify directly with the SDM office if in doubt |
Good sign: the khasra number and area on the NA Order match the sale deed and khatauni exactly, the approved use lines up with what's intended, and the order number checks out when verified with the issuing office.
Section 4 — Common Issues & How to Fix Them
An NA Order in Uttar Pradesh can involve issues such as partial conversion, missing orders despite construction, fee disputes, delayed applications, or incorrect land-use categories. Checking the NA Order Uttar Pradesh official website and verifying the approved area, land-use category, and application status with the concerned SDM or Tehsil office can help avoid problems before using or purchasing the property.
Partial conversion mismatch – The NA Order covers only part of a larger khasra, but the plot being sold falls outside it. Fix: confirm the specific portion covered before purchase, and get it surveyed if unclear.
No NA Order despite construction – Land is built on but still legally agricultural. Fix: treat this as a serious red flag; regularisation is possible in some cases but is costly and uncertain.
Fee disputes – Disagreement over the conversion charge calculation. Fix: request a written fee breakdown from the SDM office before paying.
Stalled application – Files pending for months with no update, common in manual-process districts. Fix: follow up in person and ask for the specific pending requirement.
Wrong use category approved – Order granted for residential use but land is being sold or used commercially. Fix: apply for a fresh or amended order matching the actual use.
Missing Lekhpal verification – Application stuck before field inspection. Fix: request a status update directly from the Tehsil, since this step is often the bottleneck.
Section 5 — Recent Changes in 2026
Uttar Pradesh has been speeding up Section 80 conversion and mutation processes through digital platforms, with applications, Lekhpal reports, and checks increasingly integrated online as of early 2026, particularly in districts under Development Authority jurisdiction. This has reduced the number of in-person Lekhpal visits required in some areas and made tracking faster, though the overall process still runs slower in UP than in states with fully automated conversion systems. No statewide statutory change to the underlying conversion fee structure has been confirmed as of August 2026 — confirm current charges with your Tehsil.
Section 6 — Why an NA Order Matters for Land Buyers
Confirms the land is legally eligible to carry a residential, commercial, or industrial structure at all.
Required before building plan approval can be sought.
Banks generally won't finance construction on land that's still classified as agricultural.
Protects against demolition risk for structures built on unconverted land.
Confirms the approved use matches your actual intended purpose.
Affects resale value significantly — converted land commands a different market than raw agricultural land.
Section 7 — NA Order vs. Building Plan Approval
NA Order | Building Plan Approval | |
What it proves | The land itself is legally cleared for non-agricultural use | The specific building design complies with bye-laws |
Issued by | SDM/Assistant Collector | Development Authority/Nagar Nigam/Panchayat |
Needed for | Before any construction planning can begin | Before actual construction starts |
These two documents work in sequence, not in place of each other — an NA Order without a sanctioned building plan still leaves construction unauthorized. If you're selling land in Uttar Pradesh that only has one of the two, disclosing that gap upfront saves time, since a serious buyer's due diligence will check for both.
Section 8 — Related Documents
Building Plan Approval in Uttar Pradesh — the next step after land conversion
Dakhil Kharij in Uttar Pradesh — updating ownership records
Bhulekh Records in Uttar Pradesh — checking khasra and khatauni
CLU Certificate in Rajasthan — the equivalent land-use conversion process in Rajasthan
Property Document Checklist in Uttar Pradesh — the full set of papers to verify

